Day 2 of the robotics competition consisted of finishing the chassis, mounting and connecting the electronics, and assembling the loading and launching mechanisms. First was the chassis, which involved lengthening the chains, attaching them to the sprockets, and then locking them into the gear boxes. Next was the electronics. We needed to find a way to mount the battery, power distribution board, motor controllers, and the main controller. All these must be connected by wires in a specific way and we needed to fit them within a small space on the chassis. The loading mechanism was a chute made of wood and metal, with a motor controlled wheel to send the balls into the shooting mechanism one by one. In the shooting mechanism, the balls are squeezed through by two spinning wheels and shot out up a ramp. Overall, the a long day of work allowed us to progress greatly and put us on track to finish the building phase and begin the programming phase.